Service Manual
105
Test Run
7. Test Run
1
2
3
4
Check to see whether there is any refrigerant leakage, and slack of power or transmission cable.
Confirm that 500 V megger shows 2.0 M
Ω
or more between power supply terminal block and ground.
Do not operate in the case of 2.0 M
Ω
or less.
NOTE: Never carry out megaohm check over terminal control board. Otherwise the control board
would be broken.
Immediately after mounting the unit or after leaving it turned off for an extended length of time,
the resistance of the insulation between the power supply terminal board and the ground may
decrease to approx. 2 M
Ω
as a result of refrigerant accumulating in the internal compressor.
If the insulation resistance is less than 2 M
Ω
, turning on the main power supply and energizing
the crankcase heater for more than 6 hours will cause the refrigerant to evaporate, increasing
the insulation resistance.
Check if high/low pressure common pipe, liquid pipe and gas pipe valves are fully opened.
NOTE: Be sure to tighten caps.
Check if there are any problems in automatic addressing or not:
Check and confirm that there are no error messages in the display of indoor units or remote controls
and LED in outdoor units.
7.1 Checks Before Test Run
CAUTION
when cutting main power of the Multi V
• Always apply main power of the outdoor unit during use of product
(cooling season/heating season).
• Always apply power before 6 hours to heat the crank case heater where performing test run after
installation of product. It may result in burning out of the compressor if not preheating the crank
case with the electrical heater for more than 6 hours.(In case of the outdoor temperature below 10°C)
Summary of Contents for ARNU Series
Page 13: ...Service Manual 13 External Appearance 2 2 Outdoor Units ARUN1008F20 10HP ...
Page 16: ...16 ...
Page 17: ...Service Manual 17 Indoor Units ...
Page 18: ...18 Indoor Unit ...
Page 30: ...30 Indoor Unit ...
Page 44: ...44 Indoor Unit ...
Page 79: ...Service Manual 79 Outdoor unit ...
Page 88: ...88 Outdoor Unit 5 Wiring Diagrams Wiring Diagrams ...
Page 112: ...112 Outdoor Unit ...
Page 113: ...Service Manual 113 Trouble shooting guide ...
Page 137: ...Service Manual 137 Troubleshooting Guide Resistance measure between phases of compressor ...
Page 142: ...Troubleshooting Guide 142 Outdoor Unit Connector of reactor Connectors of 3phase diode ...
Page 143: ...Service Manual 143 Troubleshooting Guide Connectors of capacitor Check IPM PCB ...
Page 150: ...Troubleshooting Guide 150 Outdoor Unit Pressure switch CHECK VALVE ...
Page 152: ...Troubleshooting Guide 152 Outdoor Unit Measure power input of outdoor unit ...
Page 153: ...Service Manual 153 Troubleshooting Guide Measure power input of outdoor unit ...
Page 156: ...Troubleshooting Guide 156 Outdoor Unit Liquid injection by pass valve ...
Page 157: ...Service Manual 157 Troubleshooting Guide Measure resistance of LEV coil ...
Page 158: ...Troubleshooting Guide 158 Outdoor Unit Heater ...
Page 168: ...Troubleshooting Guide 168 Outdoor Unit Measure input power of outdoor unit ...
Page 172: ...Troubleshooting Guide 172 Outdoor Unit Check main fuse of out door unit ...
Page 176: ...Troubleshooting Guide 176 Outdoor Unit Fan IPM ...
Page 178: ...Troubleshooting Guide 178 Outdoor Unit Measure input power of fan main PCB ...
Page 183: ...Service Manual 183 Exploded View Replacement Parts List ...