LevelOne GSW-1290 Gigabit Layer2 SNMP Switch
Chapter 2
Installation
Package Contents
Before You Connect to the Network
Installing the Switch without a Rack
Installing the Switch in a Rack
Connecting Stacked Switch Groups
Configuring a Switch Group for Stacking
External Redundant Power System
Connecting the Console Port
Password Protection
SNMP Settings
IP Address Assignment
Connecting Devices to the Switch
Package Contents
Before you begin installing the Switch, confirm that your package contains the following items:
1. One GSW-1290 Layer 2 Switch
2. Mounting kit: 2 mounting brackets and screws
3. Four rubber feet with adhesive backing
4. One AC power cord
5. This
User
Manual
6. CLI Reference Manual
Before You Connect to the Network
Before you connect to the network, you must install the Switch on a flat surface or in a rack, set up a
terminal emulation program, plug in the power cord, and then set up a password and IP address.
NOTICE:
Do not connect the Switch to the network until you have
established the correct IP settings, user accounts and proper stacking
configuration (if the Switch is stacked).
19
Summary of Contents for ProCon GSW-1290
Page 6: ......
Page 21: ...LevelOne GSW 1290 Gigabit Layer2 SNMP Switch Figure 2 3 Install Switch in equipment rack 21...
Page 22: ...LevelOne GSW 1290 Gigabit Layer2 SNMP Switch 22...
Page 61: ...LevelOne GSW 1290 Gigabit Layer2 SNMP Switch Figure 4 11 Switch Spanning Tree Settings menu 61...
Page 96: ...LevelOne GSW 1290 Gigabit Layer2 SNMP Switch 96...
Page 115: ...LevelOne GSW 1290 Gigabit Layer2 SNMP Switch 115...
Page 119: ...LevelOne GSW 1290 Gigabit Layer2 SNMP Switch 119...