Figures
Storage block . . . . . . . . . . . . . . 2
Compute block . . . . . . . . . . . . . . 2
CP Interconnect . . . . . . . . . . . . . 3
Management switch . . . . . . . . . . . . 3
Storage block components . . . . . . . . 11
Compute block components . . . . . . . 13
ThinkAgile CP hardware installed into a
rack . . . . . . . . . . . . . . . . . 19
ThinkAgile CP storage slide box
contents . . . . . . . . . . . . . . . 23
Screw pin types included with rail kit . . . . 24
10. Installing the rail in a round hole rack . . . . 25
11. Installing the rail in a square hole rack . . . . 27
12. Removal of side cover . . . . . . . . . . 29
13. Installing the enclosure into the rack . . . . 30
14. Installing screws on front of enclosure . . . . 30
15. Reinstalling the side cover . . . . . . . . 31
16. ThinkAgile CP compute slide rails box
contents . . . . . . . . . . . . . . . 32
17. Slide rails . . . . . . . . . . . . . . . 33
18. Left slide rear installation . . . . . . . . . 33
19. Left slide front installation. . . . . . . . . 34
20. Securing the compute block slide rails. . . . 34
21. Front latches on slide rails . . . . . . . . 35
22. ThinkAgile CP compute enclosure
. . . . . . . . . . . . . . 36
23. Enclosure installation into rack. . . . . . . 36
24. Compute enclosure thumbscrews . . . . . 37
25. Attaching mounting brackets to switch . . . 44
26. Securing switch to rack posts . . . . . . . 44
27. Installing power cord retention clip . . . . . 45
28. Hardware management network connectivity
in a single interconnect configuration . . . . 47
29. Single—interconnect configuration — compute
node and network interconnect
connections . . . . . . . . . . . . . . 48
30. Single—interconnect configuration —
storage block and network interconnect
connections . . . . . . . . . . . . . . 49
31. Customer data center connection: single
direct link . . . . . . . . . . . . . . . 50
32. Single direct link topology
33. Customer data center connection: dual direct
link . . . . . . . . . . . . . . . . . 52
34. Dual direct link topology . . . . . . . . . 53
35. Customer data center connection: LAG
direct link . . . . . . . . . . . . . . . 54
36. LAG direct link topology . . . . . . . . . 55
37. Hardware management network connectivity
in a dual—interconnect configuration . . . . 56
38. Dual—interconnect configuration —
compute node and network interconnect
connections . . . . . . . . . . . . . . 58
39. Dual—interconnect configuration — storage
block and network interconnect
connections . . . . . . . . . . . . . . 59
40. Dual-interconnect configuration — inter-
interconnect link network connectivity . . . . 59
41. Customer data center network
connection . . . . . . . . . . . . . . 60
42. X-Link option 1 topology . . . . . . . . . 62
43. Customer data center network
connection . . . . . . . . . . . . . . 63
44. X-Link topology option 2A . . . . . . . . 65
45. Customer data center network
connection . . . . . . . . . . . . . . 66
46. X-Link option 2B topology . . . . . . . . 68
© Copyright Lenovo 2018, 2020
iii
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Page 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 83: ......
Page 84: ......