Dual direct link topology
This section covers details about the dual direct link topology.
Based on the dual direct link topology and the uplink bandwidth option (10 Gbps or 40 Gbps) for the
customer data center connection, use the following port connectivity diagram:
Figure 33. Customer data center connection: dual direct link
Notes:
• The interconnect switch requires a single 1 Gbps copper connection (RJ45) from the out-of-band (OOB)
management port on the interconnect switch to the management switch or the OOB interconnect
network.
• Ports 51 and 54 of the interconnect switch do not have LED status indicators.
The following table provides the ports from the interconnect switch which need to be connected to the
customer data center network.
Uplink bandwidth option
Device
Network interconnect ports
10 Gbps data center network
Primary device
Interconnect, Mgmt port
Interconnect, port 48
Secondary device
Interconnec,t port 46
40 Gbps data center network
Primary device
Interconnect, Mgmt port
Interconnect, port 54
Secondary device
Interconnect, port 53
Note:
Choose either the 10 Gbps or the 40 Gbps option.
52
Lenovo ThinkAgile CP Hardware Installation Guide
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Page 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 83: ......
Page 84: ......