Table 13. 40 Gbps interconnect ports
Interconnect Ports
Customer Uplink Device
Primary interconnect, Mgmt port
Device A – 1 Gbps available port
Primary interconnect, port 53
Device A
Primary interconnect, port 54
Device B
Secondary interconnect, Mgmt port
Device B - 1 Gbps available port
Secondary interconnect, port 53
Device A
Secondary interconnect, port 54
Device B
Note:
Choose either the 10 Gbps or the 40 Gbps option.
Table 14. X-Link option 2B topology specifications
Configuration
• Customer side configured with LAG
• Network interconnect as management LAG (MLAG)
• Operates as one LAG forwarding and one LAG standby
OOB Interconnect Network
One access port for each interconnect switch connected
to the management switch or VLAN
Requirements
• LACP enabled
• STP required
Note:
The uplink VLAN must be different than the OOB management VLAN.
.
67
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Page 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 83: ......
Page 84: ......