Chapter 3. ThinkAgile CP Setup
This section covers the required steps to install the ThinkAgile CP solution into a rack. This includes installing
the storage block, the compute block, the interconnect switches and the management switch (optional).
Install ThinkAgile CP hardware in a rack
Procedures for installing ThinkAgile CP hardware in a rack.
Figure 7. ThinkAgile CP hardware installed into a rack
Required tools
You need the following tools or equipment to install the ThinkAgile CP solution into a rack:
• Standard flat-blade screwdriver
• #2 Phillips screwdriver
• Electrostatic discharge wrist strap
© Copyright Lenovo 2018, 2020
19
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Page 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 83: ......
Page 84: ......