Interconnect switch box
The interconnect switch box contains the following items:
• One CP–I–10 interconnect switch
• One mounting kit for standard 19–inch equipment rack:
– Two rails
– Two rear-post brackets
– Two front-post brackets
– Two ear-locking screws
– 20 screws
• One power cord
• One DB9–to–RJ45 console cable
• Two QSFP+ 40 GbE Direct Attach Cables (DACs)
Ship group box
The ship group box contains the following items:
• One cable management arm box:
– One cable management arm
– One
ThinkSystem D2 Cable Management Arm
installation document
• Four power cords
• Four KVM adapters with:
– One KVM port connector
– One serial connector
– One VGA video connector
– Two USB device connectors
• Two Category 5e patch cables
• Eight SFP+ 10 GbE Direct Attach Cables (DACs)
• One bag with M5 screws and two types of cage nuts
• Six velcro straps bags
• One
Safety & Regulatory Information
document
• One
Important Notices
document
• One
Storage Block Read Me
document
• One
Compute Block Read Me
document
• One
Rack Installation Guide
document
• One
Interconnect Read Me
document
• One
Interconnect Quick Start Guide
document
.
21
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Page 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 83: ......
Page 84: ......