Step 5. Extend the rail until the front mounting bracket of the rail reaches the front rack.
Step 6. Repeat steps Step 1
on page 25 to install the front rail mounting
bracket to the front mounting flange.
Note:
Do not secure the front mounting bracket of the rail with screws until you install the storage
enclosure into the rack.
Step 7. Repeat steps Step 1
on page 26 to install the opposite rail in the
rack.
The installation of the storage block slide rails in a round hole rack is now complete.
To continue with the installation of the ThinkAgile CP storage block, follow these steps: “Install the storage
enclosure” on page 29
26
Lenovo ThinkAgile CP Hardware Installation Guide
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Page 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 83: ......
Page 84: ......