Install the storage slide rails into a square hole rack
Procedures for installing ThinkAgile CP storage block slide rails in a square hole rack.
To install the ThinkAgile CP storage block slide rails in a square hole rack, do the following:
Attention:
Ensure that you install the rear mounting rail brackets before installing the front mounting
brackets.
Figure 11. Installing the rail in a square hole rack
Step 1. Open the hinge bracket on the rear of the rail.
Step 2. Remove the preinstalled screw pins for round hole rack.
Step 3. Line up the holes on the rear of the rail with the corresponding holes in the rear-mounting flange of
the rack.
Step 4. Close the hinge bracket to secure the rail to the rack flange.
Step 5. Secure the rear mounting bracket of the rail with two screws for square hole rack.
.
27
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Page 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 83: ......
Page 84: ......