Install the ThinkAgile CP storage block
Procedures for installing ThinkAgile CP storage block in a rack.
To install the ThinkAgile CP storage block in a rack, you must do the following:
1. Unpack the storage block box and check the contents
2. Install the slide rails in the rack
3. Install the storage enclosure
Firstly, unpack the storage block box and check the contents:
• One storage block
• One storage slide rails box:
– One left slide rail
– One right slide rail
– Six M5 screws
– Eight screws for square hole rack
• Two Category 5e patch cables
• Eight Category 6 patch cables
• Eight SFP+ 10 GbE transceivers
Note:
If any of the slide box items are missing or are damaged, contact your place of purchase.
Figure 8. ThinkAgile CP storage slide box contents
.
23
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Hardware Installation Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 70: ...Figure 42 X Link option 1 topology 62 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 73: ...Figure 44 X Link topology option 2A Chapter 3 ThinkAgile CP Setup 65 ...
Page 78: ...70 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 82: ...74 Lenovo ThinkAgile CP Hardware Installation Guide ...
Page 83: ......
Page 84: ......