24
Instruction Manual V 1.1 - 11/2002
5.5
Priming
Pressing the PRIME key opens the
dispensing valve as long as the
key is pressed. If the operating
pressure dropped with extended
non-operating time, the pump is automatically
switched on after pressing the key to build up
operating pressure again.
•
If the tubing between mountant bottle and
dispensing valve and the nozzle are filled
with air, hold the dispensing valve during
the priming in such a way that the nozzle
opening points upward until mountant exits
the nozzle.
5.
Operating the CV5030
•
Mountant can be let off into the prime con-
tainer at the paused position for the dis-
pensing valve (do not overfill!).
•
After refilling or replacing the mountant
bottle, please check that all air bubbles es-
cape from the tubing between mountant
bottle and dispensing valve by means of
priming.
•
PRIME disappears from the display after
initial pressing of the key; at this time, the
coverslipping process can be started.
•
Place the slides in the input rack so that the side to
be coverslipped points to the front of the unit. Verify
that the slides are fitted loosely and straight in the
magazine.
•
Open the door (
1
) in front of the bath (
2
) (next to the
main power switch) and pull out the guide rail. If the
bath is not in the front position, it will automatically be
transported to this position.
•
Pull the bath out of the unit on the guide rails. Place
the filled slide racks (
3
) in the insert (cuts pointing to
the user side).
•
Push the bath into the unit. Push the guide rails in until
they stop and close the door.
•
Check coverslip magazine and mountant bottle for
sufficient supply.
•
Insert the dispensing valve into the coverslipping
position.
•
Check the output racks for sufficient output capacity.
3
5.6
Coverslipping
1
2
Fig. 12
Summary of Contents for CV5030
Page 2: ......