Service Manual JET3
24
Rev. 1.0
5.3 Installation
For adaption to the production line several works have to be carried out and operating
parameters have to be set before start of operation.
5.3.1 Mains supply
Mains supply!
The device does not have a mains switch and should be only
connected to an easy accessible socket close to the installation
location!
The up should be connected to AC voltage 100 - 240 V AC, 50
– 60 Hz with an
appropriate plug.
The socket should be provided with a clear designation
(e.g.: JET3up).
After connecting to the mains power supply the initialization of the device will be carried
out automatically. After this process the JET3up is ready for operation.
You will find further information regarding the initialization in the
chapter
Initialization of device
!
5.3.2 Grounding (Potential equalization)
Grounding (Potential equalization)!
In case of a non existing grounding or that the grounding of the printer
is not carried out properly, this could cause serious injury or death and
it can also cause malfunctions or damages at the printer!
These dangers or demolitions can happen for example because of
electrostatic discharge (ESD) or potential difference.
Specially for countries without existing protected earth connection, there is a special
grounding point located at the side of the printer.
This threaded socket must be connected to ground if there is no ground pin in the mains
socket/plug.
The threaded case is sealed inwards and thus IP 65 conform. With a screw and a ring
terminal (cable lug) the grounding can be fixed easily.
Summary of Contents for JET3 up
Page 1: ...SERVICE MANUAL ...
Page 12: ...Service Manual JET3 12 Rev 1 0 2 4 Safety sticker Figure 1 ...
Page 58: ...Service Manual JET3 58 Rev 1 0 7 2 Documentations for SK4 Torsional moments for SK4 ...
Page 99: ...Service Manual JET3 Rev 1 0 99 7 3 Documentations for SK6 Torsional moments for SK6 ...
Page 142: ...Service Manual JET3 142 Rev 1 0 ...
Page 144: ...Service Manual JET3 144 Rev 1 0 7 4 Hydraulic 1 Hydraulic scematic ...