Service Manual JET3
Rev. 1.0
85
8.
Put in the new gutter tube and rotate the motor spindle counter clockwise to screw in
the gutter tube.
ATTENTION: The thread should not be damaged!!!
9.
Put on the retaining plate and screw in the three cross head screws by using a phillips-
tip screwdriver. Use Loctite as threadlocker. (The retaining plate can not be twisted.)
10. Cut of the inside end of the flexible tube and put it on the gutter tube.
11. Close the nozzle completely with the button
<arrow>
(1).
Checkup that the nozzle is really closed. (Do not get dizzy because of the wrong value
of the encoder. This value cannot be the right because the spindle and position of the
gutter tube have been changed.) Afterwards push button
<Ink on> (2)
.
1
– Button <arrow> 2 – Button <Ink-on>
1
2
Summary of Contents for JET3 up
Page 1: ...SERVICE MANUAL ...
Page 12: ...Service Manual JET3 12 Rev 1 0 2 4 Safety sticker Figure 1 ...
Page 58: ...Service Manual JET3 58 Rev 1 0 7 2 Documentations for SK4 Torsional moments for SK4 ...
Page 99: ...Service Manual JET3 Rev 1 0 99 7 3 Documentations for SK6 Torsional moments for SK6 ...
Page 142: ...Service Manual JET3 142 Rev 1 0 ...
Page 144: ...Service Manual JET3 144 Rev 1 0 7 4 Hydraulic 1 Hydraulic scematic ...