Service Manual JET3
116
Rev. 1.0
8.
Plug in the new oscillator into the special tool and screw it into the drop production
body. The torque to tighten the oscillator is 0,16 Nm.
9.
Mount the drop production body back on the adapter of the ground plate. Torque to
tighten the retaining screws is 0,4 Nm. The drop production body now must be
positioned correctly. Therefore take care of the markings (a slot in the drop
production body and also in the adapter). Both slots must result a long slot when the
drop production body is in the right position.
10.
Tighten the grounding cable back on the ground plate. Plug in the coax cable.
11.
Mount the nozzle back in the drop production body therefore take a look at the
chapter
<Removing and cleaning the nozzle>.
12.
Now the ink stream must be adjusted therefor take a look at the chapter
<head
adjustment>
.
Summary of Contents for JET3 up
Page 1: ...SERVICE MANUAL ...
Page 12: ...Service Manual JET3 12 Rev 1 0 2 4 Safety sticker Figure 1 ...
Page 58: ...Service Manual JET3 58 Rev 1 0 7 2 Documentations for SK4 Torsional moments for SK4 ...
Page 99: ...Service Manual JET3 Rev 1 0 99 7 3 Documentations for SK6 Torsional moments for SK6 ...
Page 142: ...Service Manual JET3 142 Rev 1 0 ...
Page 144: ...Service Manual JET3 144 Rev 1 0 7 4 Hydraulic 1 Hydraulic scematic ...