
Page 37 of 60
2.
Each fence half (E) can be moved independently, in o out, depending on the type of shaping
operation that is being performed. To move the fence halves in or out, loosen one of the locking
knobs (H) and turn one of the adjusting knobs (I) until the correct setting is obtained and tighten
locking knob (H).
3.
The complete fence assembly can be rapidly positioned on the table by loosening two locking
handles (D), moving the fence assembly to the desired position and tightening the two locking
handles (D).
ASSEMBLING DUST CHUTE
For 5-speed spindle moulder
Assemble dust chute (A) Fig.3.26. to rear of machine table, using
the two screws and washers (B) as shown.
Air suction (A) for table: 101.6 mm (4”)
Fig.3.26
Assemble dust chute (A) Fig.3.26.1 for safety fence assembly,
using the two screws and washers (B) as shown.
Air suction (A) for safety fence assy.
SS-510/511series: 101.6mm (4”)
SS-512
~
PS-515 series : 127 mm (5”)
Fig. 3.26.1
For 3-speed spindle moulder
Two 4” diameter dust chutes are provided to allow you to connect your
machine to a dust collector or central dust collection system.
One dust chute opening is provided on the fence and another dust chute
opening (A) Fig.3.27 is provided on the machine frame.
Air suction (A): 101.6 mm (4”)
《
WARNING
》
The suction system should have a flow rate with a speed of
at least 4900 F/M to 5900 F/M (25M/S to 30 M/S).
Air delivery: 45
~
50 M
3
/Min
Fig. 3.27
Summary of Contents for S45T
Page 12: ...Page 12 of 60 1 8 Fig 1 1 1 Fig 1 1 2...
Page 13: ...Page 13 of 60 1 9 Fig1 1 3 Fig 1 1 4 1 10 Fig 1 1 5...
Page 48: ...Page 48 of 60 3 24...
Page 49: ...Page 49 of 60 3 25...
Page 54: ...Page 54 of 60 3 30...
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......