CHAPTER 2. INSTALLATION
2.1 UNPACKING AND CLEANUP
To ensure maximum performance from your spindle shaper, clean it properly; and install it accurately before
use.
As soon as you receive the spindle shaper, we recommend you follow these procedures:
1. Inspect packing crate for damage in transit. Record damage, and report it immediately to shipper.
2. Open crate and check that machine arrived in good condition. If not, let your industrial distributor know
immediately.
3. Before lifting machine, remove all foot bolts locking it to its shipping base.
4. Transport machine to location with a hand truck or dolly.
5. Do not use solvents on plastic parts and electric cord; solvents dissolve or damage plastic and electric cord.
Transportation after Unpacking: crane or fork lift recommended for transportation
The machine can be lifted by using a crane placing the cables as shown in Fig.2.1 or with a fork lift inserting
the forks as close as possible to the supports. Refer to Fig.2.2.
The hoist and sling/cables must be with capability of withstanding machine weight. Their cables should be
capable of lifting 2tons. Two ends of sling should be at an angle of under 60 degrees.
Fork lift, two forks, should be capable of lifting 2 tons. To move the machine must slow down, especially pay
attention to it's balance.
The machine is lifted by crane or removed by fork lift and the removal of pallet packing is achieved.
Fig. 2.1
Fig. 2.2
2-1
Summary of Contents for S45T
Page 12: ...Page 12 of 60 1 8 Fig 1 1 1 Fig 1 1 2...
Page 13: ...Page 13 of 60 1 9 Fig1 1 3 Fig 1 1 4 1 10 Fig 1 1 5...
Page 48: ...Page 48 of 60 3 24...
Page 49: ...Page 49 of 60 3 25...
Page 54: ...Page 54 of 60 3 30...
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......