English
(1
5. Installation Check-up
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-leveling device is working properly.
•
The expansion valves are working properly
GROUPS
•
+RRNXSWKH¿OWHUKROGHUVWRWKHJURXSVZLWKRXWFRIIHH
•
Let each group dispense water for about a minute.
HOT WATER
•
&RQWLQXRXVO\GLVSHQVHKRWZDWHUSUHVVLQJWKHDSSURSULDWHEXWWRQXQWLODWOHDVWOLWUHVRIZDWHUKDYHEHHQXVHGVHH
the “Hot water dispensing” chapter in the User’s Manual).
STEAM
(also with Turbosteam)
•
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
WARNING
$)7(5,167$//$7,21&+(&.726((,)7+(0$&+,1(,6:25.,1*3523(5/<VHHWKH
Installation Module C).
WARNING
21&(7+(0$&+,1(+$6%((1,167$//('$1',65($'<)2586(%()25($//2:,1*
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
02_M100_multi_ridotto.indd 5
11/03/2014 10:27:48