2KJ/2KH
1-3-3
High voltage
U100
Setting the main high voltage
Grid control voltage
Copy interval
Copy quantity
Correction amount
107
*1
60
*1
50
*1
10
*1
U101
Setting the other high voltages
Setting the developing bias
Setting the transfer voltage
Setting the separation voltage
27/45/22/45
*1
123/126/33/31
*1
1/20/42/2
*1
U110
Checking the drum count
-
Developing
U130
Initial setting for the developing unit
-
U144
Setting toner loading operation
OFF/5/30
*1
U150
Checking sensors for toner
-
U157
Checking/clearing the developing drive time
-
U158
Checking the developing count
-
Fuser and
cleaning
U161
Setting the fuser control temperature
Primary stabilization fixing temperature
Secondary stabilization fixing temperature
Copying operation temperature 1
Copying operation temperature 2
145
*1
165
*1
175
*1
185
*1
1
*1
2
*1
U162
Stabilizing fixing forcibly
-
U163
Resetting the fuser problem data
-
U167
Checking/clearing the fuser counts
-
U198
Setting the fuser phase control
OFF
*1,*2
U199
Checking the fuser temperature
-
Operation
panel and
support
equipment
U200
Turning all LEDs on
-
U202
Setting the KMAS host monitoring system
-
U203
Checking DP operation
-
U204
Setting the presence or absence of a key card or key counter
OFF
*1,*2
U207
Checking the operation panel keys
-
U233
Limiting job separator output
MODE0
*1
U243
Checking the operation of the DP motors
-
U244
Checking the DP switches
-
U245
Checking messages
-
U246
Setting the finisher
4/4/4
*1
U249
Checking the paper ejection to optional devices
-
Mode setting
U250
Setting the maintenance cycle
150000
*1,*2
U251
Checking/clearing the maintenance count
-
U252
Setting the destination
JAPAN
*1
U253
Switching between double and single counts
DOUBLE COUNT
(A3/LEDGER)
*1,*2
U254
Turning auto start function ON/OFF
ON
*1,*2
U260
Selecting the timing for copy counting
EJECT
*1,*2
Section
Item
No.
Content of maintenance item
Initial
setting*
*Initial setting for executing U020, *1: The item initialized for executing U020, *2: The item initialized for executing U021
Summary of Contents for TASKalfa 181
Page 1: ...SERVICE MANUAL Published in October 2009 842KJ112 2KJSM062 Rev 2 TASKalfa 181 TASKalfa 221 ...
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 14: ...2KJ 2KH This page is intentionally left blank ...
Page 114: ...2KJ 2KH 1 3 74 This page is intentionally left blank ...
Page 152: ...2KJ 2KH 1 4 38 This page is intentionally left blank ...
Page 292: ...INSTALLATION GUIDE FOR PAPER FEEDER ...
Page 306: ...INSTALLATION GUIDE FOR DUPLEX UNIT ...
Page 315: ...INSTALLATION GUIDE FOR BUILT IN FINISHER ...
Page 327: ...INSTALLATION GUIDE FOR JOB SEPARATOR ...
Page 336: ...INSTALLATION GUIDE FOR FAX System R ...
Page 351: ...INSTALLATION GUIDE FOR Scan System F B ...
Page 354: ......
Page 355: ......