2KJ/2KH
1-2-17
1-2-4 Installing the cassette heater (option)
Installing the cassette heater requires the following component:
Cassette heater (P/N 302KK94470): for 220 to 240 V specifications only
Cassette heater (P/N 302KK94460): for 120 V specifications
One (1) M3 x 8 S tight screw (P/N 7BB700308H)
Procedure
1. Open the front cover.
2. Remove the screw and release three hooks
and then remove the front right cover.
3. Pull out the cassette.
Figure 1-2-24
Front right cover
Screw
Front right
cover
Hook
Hook
Hook
Summary of Contents for TASKalfa 181
Page 1: ...SERVICE MANUAL Published in October 2009 842KJ112 2KJSM062 Rev 2 TASKalfa 181 TASKalfa 221 ...
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 14: ...2KJ 2KH This page is intentionally left blank ...
Page 114: ...2KJ 2KH 1 3 74 This page is intentionally left blank ...
Page 152: ...2KJ 2KH 1 4 38 This page is intentionally left blank ...
Page 292: ...INSTALLATION GUIDE FOR PAPER FEEDER ...
Page 306: ...INSTALLATION GUIDE FOR DUPLEX UNIT ...
Page 315: ...INSTALLATION GUIDE FOR BUILT IN FINISHER ...
Page 327: ...INSTALLATION GUIDE FOR JOB SEPARATOR ...
Page 336: ...INSTALLATION GUIDE FOR FAX System R ...
Page 351: ...INSTALLATION GUIDE FOR Scan System F B ...
Page 354: ......
Page 355: ......