SAFETY
SAFETY LABELS
2-29
SIGNALMAN'S SIGNAL AND SIGNS
2
q
Set up signs to inform of road shoulders and soft ground.
q
When it is necessary to position loads, make excavations or move the machine with reduced field of vision, the
operator must be helped by another person standing on the ground and making signals to indicate the
manoeuvres to be carried out, according to the specific signals defined by the relevant regulations.
HAND SIGNALS
2
WARNING
q
No movement or operation should be carried out if the signals have not been clearly understood by
the operator and the signalman.
q
When additional instructions different from those defined by the manual signalling system are
necessary, these must be agreed upon by the operator and the signalman before starting the job.
q
Only one person must be entrusted with making signals.
q
The operator must make sure that the signalman is always within his field of vision and follow all his
signals.
The use of hand signals serves to direct the lifting, handling and positioning of the loads lifted by the work
equipment. Hand signals can also be used during digging operations or when the machine travels, if the field of
vision of the operator is reduced. The direction of movement of the hands and arms in relation to the machine must
define the signal, independently of the position of the signalman. Hand signals must be performed following the
indications given below.
q
LIFT THE LOAD VERTICALLY
With a forearm in vertical position and the forefinger
pointing upwards, rotate the hand making small circles.
q
LOWER THE LOAD VERTICALLY
With an arm extend ed and the fo refinger pointin g
downwards, rotate the hand making small circles.
WEAM014802
Summary of Contents for PC118MR-8
Page 1: ......
Page 2: ......
Page 3: ...FOREWORD 11 WEAM014802...
Page 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Page 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Page 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Page 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Page 379: ...SPECIFICATIONS 15 WEAM014802...
Page 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Page 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...