MAINTENANCE
MAINTENANCE PROCEDURES
4-47
MAINTENANCE EVERY 250 HOURS OF OPERATION
4
CHECKING THE OIL LEVEL IN THE FINAL REDUCTION GEARS AND TOPPING UP
4
WARNING
q
Soon after the machine has been stopped the engine oil is very hot and may cause burns; let the
engine cool down until it reaches a temperature of 40–45°C before draining the oil.
q
Loosen the cap slowly to release any residual pressure.
q
The operation must be carried out with the machine positioned on firm and level ground.
1.
The check must be carried out on each reduction gear,
with the drain plug (P) in low position and perpendicular to
the ground.
REMARK
If necessary, move the machine slightly until reaching the
specified position, which is indispensable for an accurate
check.
2.
This check is visual. Check that the lubricant reaches the
hole (G) top rim. If oil level is too low, restore the level
through the filling hole (F) using the oil specified. (For
details, see "FUEL, COOLANT AND LUBRICANTS (4-
12)").
3.
After the check, refit the plugs (F) and (G).
WEAM014802
Summary of Contents for PC118MR-8
Page 1: ......
Page 2: ......
Page 3: ...FOREWORD 11 WEAM014802...
Page 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Page 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Page 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Page 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Page 379: ...SPECIFICATIONS 15 WEAM014802...
Page 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Page 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...
Page 417: ......
Page 418: ......