MAINTENANCE PROCEDURES
MAINTENANCE
4-84
Accumulator operation check
CAUTION
Before starting check operations, make sure that no person or other obstacles are in the surrounding
area.
Replace the accumulator every 2 years or 4000 hours, based on the situations checked before.
Check nitrogen loading pressure as follows.
1.
Park the machine on firm and level ground.
2.
Place the working tool as extended as possible (fully
extended boom and bucket in discharge position) and keep
it 1.5 m (A) away from the ground..
REMARK
Carry out the operations described in points 3-5 within 15
seconds.
Pressure in the accumulator descends gradually when the
engine is stopped. Therefore, the check must be carried out
immediately after the engine is stopped.
3.
Keep the working tool at the maximum distance, turn the
start-up key to OFF and stop the engine.
4.
Turn the starter key to ON.
WEAM014802
Summary of Contents for PC118MR-8
Page 1: ......
Page 2: ......
Page 3: ...FOREWORD 11 WEAM014802...
Page 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Page 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Page 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Page 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Page 379: ...SPECIFICATIONS 15 WEAM014802...
Page 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Page 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...
Page 417: ......
Page 418: ......