MAINTENANCE
MAINTENANCE PROCEDURES
4-43
2.
Let the engine idle and turn the work equipment 90° to
move them to the side of the track.
3.
Force the first boom until the track is lifted from the ground,
spin the track for two minutes. Repeat this procedure on
both the left and right side of the machine.
Bleeding the optional attachments
NOTICE
If the manufacturer of an attachment indicates a specific
bleeding procedure, follow the instructions.
If a hydraulic breaker or another accessory is installed on the
machine, run the engine at idle and press the control several
times (around 10 times) until the air has been purged from the
accessories circuit.
NOTICE
q
After the bleeding operation, stop the engine and wait
at least 5 minutes before starting work to eliminate all
the air bubbles from the oil present in the hydraulic
cylinder.
q
Make sure that there are no oil leakages and remove
any oil that may have been spilled.
WEAM014802
Summary of Contents for PC118MR-8
Page 1: ......
Page 2: ......
Page 3: ...FOREWORD 11 WEAM014802...
Page 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Page 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Page 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Page 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Page 379: ...SPECIFICATIONS 15 WEAM014802...
Page 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Page 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...
Page 417: ......
Page 418: ......