MDC-5200/5500 Series
Chapter 3 Installation method
0092655002-03
3-35
3.3.2.4 Flush mounting of MRO-108
Preparation:
(1) Cut an opening with the size as shown in Figure 3.16 on the side for mounting a Display unit on the
panel.
(2) Mark the place of holes for mounting.
(4mm screw for 4holes)
(1
5
/3
2
)
12
(5
3
/6
4
)
128
(4
5
/6
4
)
122
(15/32)
12
(12 33/64)
318
(15/32)
12
(13 15/32)
342
(3
5
5
/6
4
)
98
(13 45/64)
348
Unit : mm(inch)
Installation:
(1) Remove corner guard caps of four corners of the Operation panel enclosure.
(2) Insert the Operation panel and its connecting cable into the opening and adjust the Operation
panel parallel to the mounting face (Figure 3.17).
(3) Secure the Operation panel to the panel with 4 mm tapping screw (4 places).
(4) Return corner guard caps removed in (1) to the original places.
Figure 3.16 Diagram of processing holes for mounting an Operation panel
Figure 3.17 Flush Mounting the Operation unit
Note) Panel thickness: 10 mm (max)
Corner guard cap
(4 places)
M4 screw
(4 places)
Operation unit
Summary of Contents for MDC-5204
Page 1: ......
Page 2: ......
Page 26: ...Chapter 3 Installation method MDC 5200 5500 Series 3 2 0092655002 03 RB808 RB809 Unit mm inch ...
Page 70: ... This page intentionally left blank ...
Page 154: ... This page intentionally left blank ...
Page 174: ... This page intentionally left blank ...
Page 175: ...0092655002 03 A 1 INTER CONNECTION DIAGRAM RB806 ...
Page 176: ...A 2 0092655002 03 INTER CONNECTION DIAGRAM RB807 ...
Page 177: ...0092655002 03 A 3 INTER CONNECTION DIAGRAM RB808 ...
Page 178: ...A 4 0092655002 03 INTER CONNECTION DIAGRAM RB809 ...
Page 179: ...0092655002 03 A 5 INTER CONNECTION DIAGRAM MRD 109 MRO 108 ...
Page 180: ...A 6 0092655002 03 INTER CONNECTION DIAGRAM MRD 111 ...
Page 181: ......
Page 182: ......