A-61593 September 2007
2-23
The indicator on the Context Selection button summarizes the state of
the runs.
Creation Date
— date and time the run was created.
Last Modified
— date and time the run was last processed.
Destination
— the next destination where the task file will be sent.
Button
Color
State of run
Green
All runs in the Task table are closed.
Yellow
There is at least one run open in the Task table.
Red
There is at least one failed run in the Task table.
Blue
A task is processing.