System Setup, 14-Ports
U3022
B
H10
Preparing the PNA-X Network Analyzer for Lock-Link Kit U3021-60005
1.
Remove the feet from the bottom of the network analyzer. Refer to
Figure
8
.
Figure
8
Rear Bottom Feet
Figure
9
Install Locking Feet
Standoffs (x2)
Feet (x4)
Locking Feet
(5023-0132)
Screws (0515-1619)
Included in package
2. Remove the two lower standoffs and screws (0515-1619) from the rear panel on the
network analyzer.
3.
Install the two rear locking feet (5023-0132) using the included screws (0515-1619),
where the standoffs were removed. Refer to
Figure
9
.
Table 7
Table Top Setup Accessories, Ordered Separately
Description
Part Number
Qty
Screw Machine Pan Head, Torx-T15 M3.5 x 0.6, 8 mm LG
0515-1402
8
Lock-Link Clip
1600-1423
4
Lock-Link Kit
U3021-60005
1
System Setup, 14-Ports
The following procedure provides instructions for stacking the PNA-X and Test Set on a table top.
If this is the case, you will need the Lock-Link accessories shown in
Table 7
below. Only interface
cabling is provided with the U3022BH10 Test Set as indicated in
installing the equipment in a racked system cabinet, skip this procedure and go to
Connection, 14-Port System" on page 25
U3022BH10 User's and Service Guide
23