- 166 -
16-6-2 Hook stowing procedure
(611A-0039-0E)
(1) Extend the four outriggers to the intermediate extension position
or more and confirm that the ACS display matches the actual
outrigger status.
(2) Set the ACS working status to "jib setting".
・
Always refer to the separate "ACS instruction manual" for ACS operation.
・
When "jib setting" is set to the ACS, the overhoisting detector is disabled, so work with extra
attention to the position of the hook.
(541A-0189-1E)
(3) Fully retract the boom and move the hook so it is directly above
the fixing ring.
(4) Lower the winch so that the hook can be hooked into the fixing ring.
Take care that the hook does not touch the cab.
(491A-0057-0E)
(5) Hook the hook into the hook fixing ring.
Summary of Contents for SR-300L
Page 2: ...SR 300L 214521 11 5 mm...
Page 6: ...4 MEMO...
Page 10: ...8 MEMO...
Page 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Page 15: ...2 MEMO...
Page 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Page 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Page 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Page 29: ...16 MEMO...
Page 67: ...54 MEMO...
Page 74: ...60 MEMO...
Page 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Page 169: ...153 ON OFF...
Page 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Page 216: ...199...
Page 217: ...200...
Page 218: ...201...
Page 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Page 225: ...208...
Page 226: ...209...
Page 227: ...210...
Page 233: ......