1) Recheck the working area.
Check again that the ground in the area where you are going to perform pick and carry operation is firm and
level.
If the ground is crumbly or muddy, pick and carry operation will not be possible there.
2) Recheck the rated lifting capacity chart.
Recheck the rated load, boom length and other conditions for the pick and carry operation and perform
according to the values in the relevant rated lifting capacity chart.
3) Recheck the tire pressure.
4) Lock the suspension.
Lock the suspension with the cylinders fully retracted.
5) Set the ACS working status.
Set the "pick and carry operation" on the "working status setting
screen".
Any
mistake
in
setting
the
ACS
working status can be extremely
dangerous.
6) Apply the slewing brake to immobilize the superstructure.
7) Use the high/low speed switch on the switch panel to select "low range" and move the shift lever to speed 1.
8) When you have finished setting the ACS working status, proceed with crane operation.
Crane operation while in motion is forbidden. If you must lift the load just off the ground and
clear any irregularities on the ground surface, stop the crane, apply the parking brake and hoist
the load sufficiently to avoid any obstacles.
If this operation leaves the load hoisted a long distance above the ground, lower it back down
close to the ground as soon as possible.
(541A-0201-2E)
Summary of Contents for SR-300L
Page 2: ...SR 300L 214521 11 5 mm...
Page 6: ...4 MEMO...
Page 10: ...8 MEMO...
Page 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Page 15: ...2 MEMO...
Page 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Page 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Page 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Page 29: ...16 MEMO...
Page 67: ...54 MEMO...
Page 74: ...60 MEMO...
Page 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Page 169: ...153 ON OFF...
Page 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Page 216: ...199...
Page 217: ...200...
Page 218: ...201...
Page 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Page 225: ...208...
Page 226: ...209...
Page 227: ...210...
Page 233: ......