- 168 -
17. Crane operation without outriggers
(541A-0193-0E)
(1) Preparations for crane operation
Before starting crane operation, always follow the procedure below to change the machine's position from driving
condition to a position suitable for crane operation.
The ACS preoperational check should be conducted when all outriggers are fully extended for
maximum safety. If you will not be able to fully extend the outriggers in the actual work site,
move to a more spacious area first, extend the outriggers fully and conduct the ACS
preoperational check.
(491A-0078-1E)
Always follow the specified procedure and precautions strictly to set the machine in its working
configuration before you start crane operation.
Crane operation with the crane in an incorrect position could cause severe accidents.
(541A-0172-0E)
Summary of Contents for SR-300L
Page 2: ...SR 300L 214521 11 5 mm...
Page 6: ...4 MEMO...
Page 10: ...8 MEMO...
Page 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Page 15: ...2 MEMO...
Page 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Page 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Page 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Page 29: ...16 MEMO...
Page 67: ...54 MEMO...
Page 74: ...60 MEMO...
Page 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Page 169: ...153 ON OFF...
Page 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Page 216: ...199...
Page 217: ...200...
Page 218: ...201...
Page 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Page 225: ...208...
Page 226: ...209...
Page 227: ...210...
Page 233: ......