(7) Before beginning crane operation, lift the load off the ground to
gauge the working condition and confirm that the ground
supports the outriggers adequately. If an outrigger supervisor is
appointed to observe outriggers during operation, safety will be
enhanced.
(8) Use of anchors is prohibited
If the outriggers or other parts are held down by anchor ropes to
lift the overload, the crane may be damaged by excessive loads
and an accident might result. Never use an anchor rope.
13-2-3 Precautions on operation
(0099-0168-2E)
(1) Do not lift loads in excess of the rated lifting capacity
If you lift loads in excess of the rated lifting capacity, an
excessive load acts on the crane which could cause it to break or
tip over.
Before you start work, always confirm lifting capacity from the
rated lifting capacity chart. Lifting capacity varies with boom
length and working radius. Take care never to exceed the rated
lifting capacity under any circumstances.
(2) Never disable safety devices
If you deliberately disable the operation of safety devices and
continue work, you may apply an excessive load or overhoist
the wire rope without noticing and cause an accident.
This crane is fitted with safety devices to sound alarms or
automatically stop operations to prevent overloading or hook
overhoisting. Only work while all safety devices are set
correctly.
Summary of Contents for SR-300L
Page 2: ...SR 300L 214521 11 5 mm...
Page 6: ...4 MEMO...
Page 10: ...8 MEMO...
Page 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Page 15: ...2 MEMO...
Page 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Page 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Page 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Page 29: ...16 MEMO...
Page 67: ...54 MEMO...
Page 74: ...60 MEMO...
Page 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Page 169: ...153 ON OFF...
Page 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Page 216: ...199...
Page 217: ...200...
Page 218: ...201...
Page 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Page 225: ...208...
Page 226: ...209...
Page 227: ...210...
Page 233: ......