- 162 -
16-5-2 Outrigger stowage procedure
(061A-0080-3E)
When you are going to stow the outriggers, always set the superstructure to the driving position as shown in the
diagram below.
(1) Check that the outrigger operation OK indicator lamp is lit.
Conditions
for
lighting
・
If the crane position is in a boom length and boom angle as indicated on the capacity chart for pick and carry
operation.
・
If the ACS boom operation status is set to "jib setting".
(2) Extract all four stopper pins from the outriggers.
If you cannot take an outrigger stopper pin out, retract the vertical cylinder first. Once it is fully
retracted, extend (or retract) the outrigger beam until you can take the pin out.
(591A-0089-1E)
Summary of Contents for SR-300L
Page 2: ...SR 300L 214521 11 5 mm...
Page 6: ...4 MEMO...
Page 10: ...8 MEMO...
Page 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Page 15: ...2 MEMO...
Page 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Page 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Page 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Page 29: ...16 MEMO...
Page 67: ...54 MEMO...
Page 74: ...60 MEMO...
Page 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Page 169: ...153 ON OFF...
Page 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Page 216: ...199...
Page 217: ...200...
Page 218: ...201...
Page 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Page 225: ...208...
Page 226: ...209...
Page 227: ...210...
Page 233: ......