- 143 -
(3) Right control lever
1) Boom derricking/lowering operation
: Set the crane operation switch to the "ON" position and push
the right control lever left to derrick the boom.
: Set the crane operation switch to the "ON" position and push
the right control lever right to lower the boom.
2) Main winch operation
Set the main winch switch to the "ON" position before operating
the main winch.
: Set the crane operation switch to the "ON" position and pull
the right control lever backward to wind up the winch.
: Set the crane operation switch to the "ON" position and push
the right control lever forward to lower the winch.
(4) Boom extension/retraction pedal
Use the boom extension/retraction switch to select the boom extending or retracting sections.
: Set the crane operation switch to the "ON" position and depress the boom extension/retraction pedal forward
to extend the boom.
: Set the crane operation switch to the "ON" position and depress the boom extension/retraction pedal backward
to retract the boom.
Summary of Contents for SR-300L
Page 2: ...SR 300L 214521 11 5 mm...
Page 6: ...4 MEMO...
Page 10: ...8 MEMO...
Page 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Page 15: ...2 MEMO...
Page 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Page 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Page 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Page 29: ...16 MEMO...
Page 67: ...54 MEMO...
Page 74: ...60 MEMO...
Page 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Page 169: ...153 ON OFF...
Page 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Page 216: ...199...
Page 217: ...200...
Page 218: ...201...
Page 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Page 225: ...208...
Page 226: ...209...
Page 227: ...210...
Page 233: ......