- 167 -
(6) Set the main winch switch to the "ON" position and move the right control lever to the "hoisting" side and
"lowering" side simultaneously to lower the boom to the level.
・
Take care that the wire rope does not get tangled on the drum.
・
At this time, take care that the wire rope does not get too tightened.
If excessive tension is applied to the wire rope, the automatic function will work.
(541A-0192-1E)
(7) Before driving on the roads after stowing the hook, set the machine in the driving position.
(8) Stow the four outriggers and insert the stopper pins to check that the outriggers are stowed completely.
(9) Set the PTO switch to the "OFF" position.
Summary of Contents for SR-300L
Page 2: ...SR 300L 214521 11 5 mm...
Page 6: ...4 MEMO...
Page 10: ...8 MEMO...
Page 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Page 15: ...2 MEMO...
Page 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Page 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Page 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Page 29: ...16 MEMO...
Page 67: ...54 MEMO...
Page 74: ...60 MEMO...
Page 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Page 169: ...153 ON OFF...
Page 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Page 216: ...199...
Page 217: ...200...
Page 218: ...201...
Page 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Page 225: ...208...
Page 226: ...209...
Page 227: ...210...
Page 233: ......