- 231 -
Inspection and servicing of each part
4. Inspection and servicing of each part
4-5-2 Inspection and replacement of the side cutters
(02E0-0051-0E)
(1) Inspection procedure
The limit of use is as shown in the diagram.
(2) Replacement procedure
1) Clean away any earth etc. which is stuck around the attachment
bolts.
2) Unscrew the attachment bolts and remove the side cutters. If the
bolts are corroded in place and cannot be removed, melt them
away to cut down.
3) Clean and smooth the attachment surfaces and attach new side
cutters. Use new bolts, nuts and spring washers.
NOTE
Side cutter attachment bolt tightening torque:
423N
・
m (43.2kgf
・
m)
4-5-3 Lifting hook inspection (optional)
(01E0-0362-0E)
Inspect the hook for wear, cracks and deformation, the hook mounting
for cracks, the rope retainer (latch, spring, pin, spring pin) for damage,
and check the overall function.
If the hook has any problem, repair or replace it.
Summary of Contents for REDGZM HD514MR-7
Page 2: ...218621 背厚 13 mm 中 ...
Page 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Page 12: ... 10 MEMO ...
Page 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Page 57: ... 41 Part names and terms 2 Part names and terms ...
Page 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Page 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Page 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Page 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Page 185: ... 168 2 Inspection and servicing table ...
Page 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Page 261: ... 244 244 MEMO ...
Page 290: ... 272 MEMO ...
Page 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Page 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Page 317: ... 298 298 MEMO ...
Page 325: ...899 92186210 ...