- 181 -
3. Lubrication
Lubrication
3-4 Greasing chart
(01E0-0289-0E)
・
For the first 50 hours after the machine is new, grease all front attachment pins every 10 hours
of operation or daily.
・
If using any attachment besides the original KATO bucket (breaker, crusher, etc.), grease the
attachment pins every 10 hours of operation or daily. (The attachment pins are the four pins at
the end of the arm, which include the rod-end bucket cylinder pin.)
・
If digging in water, after finishing operations each day, grease all parts that were under water.
(01E0-0561-4E)
Summary of Contents for REDGZM HD514MR-7
Page 2: ...218621 背厚 13 mm 中 ...
Page 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Page 12: ... 10 MEMO ...
Page 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Page 57: ... 41 Part names and terms 2 Part names and terms ...
Page 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Page 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Page 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Page 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Page 185: ... 168 2 Inspection and servicing table ...
Page 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Page 261: ... 244 244 MEMO ...
Page 290: ... 272 MEMO ...
Page 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Page 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Page 317: ... 298 298 MEMO ...
Page 325: ...899 92186210 ...