
– 4 –
Semi-dry head, cylinder-bed top and bottom coverstitch machine
Applicable model : MF-7800D Series Thread trimmer
(2) MF-7800D Series Thread trimmer
8 to 10
Application code
Application
Description
U10
For universal
Lapseam, Covering, Hemming
K10
For covering
Flatting-out
H21
For Hemming
With left hand fabric trimmer
E10
For elastic band attaching
With right hand fabric trimmer/tension roller
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
M F 7 8
D
–
14 to 25
Device and attachment
UT22
Solenoid type vertical thread trimmer unit
UT24
Pneumatic blow bobbin thread trimmer unit
UT25
Pneumatic vertical thread trimmer unit
MC35
Pneumatic dust collection unit (solenoid type)
PL11
Cloth flat rollers
3 to 6
Model code
7822
2-needle top & bottom covering stitch
7823
3-needle top & bottom covering stitch
7813
3-needle one-side covering stitch
12 to 13
Needle gauge
40
4.0mm
56
5.6mm
64
6.4mm
* In case of 3-needle, it is not possible to select 48.
11
Tongue shape of throat plate
B
Standard
D
D-type
27
Specification Code for Destination
A
Standard
G
For China (domestic China)
H
For Turkey
30
Classification of table specifications
1
Desktop
2
Semi-submerged
28
Accessory Specification Code
A
G
Standard (Foreign language manuals in Japanese, English,
Chinese, German, French, Italy, Turkey, and Spanish)
Chinese (available only in China) (2-language manual in
English and Chinese)
29
Control box and motor classification
B
SC-500/M50
C
SC-510/M51
Summary of Contents for MF-7800D Series
Page 64: ...60 5 Adjusting the upper knife stroke A B Standard Adjustment H21...
Page 66: ...62 MEMO...
Page 80: ...76 3 Adjusting the elastic band presser plate 0 5mm Standard Adjustment E10 A A Approx 7 5 mm...
Page 84: ...80 MEMO...
Page 94: ...90 3 Setting of SC 510 2 Change of the setting Type B Type A Standard Adjustment UT25...
Page 114: ...110 MEMO...
Page 118: ...114 2 Installing SC 510 1 Wiring SC 510 Standard Adjustment UT22...
Page 124: ...120 MEMO...
Page 134: ...130 MEMO...
Page 142: ...138 7 Feed timing of the roller A Standard Adjustment PL11 C D B...