– 50 –
1) Synchronizer
can be installed by the method be-
low.
2) Using two setscrews
, mount synchronizer fixing
plate
on the sewing machine. Then, install
synchronizer
on it.
3) Fix a cord of synchronizer
to synchronizer fixing
plate
by means of cable clip band
. Fasten the
cord in the illustrated position, using cord clamp
and setscrew
.
(18) Adjusting and setting SC-510
1. When SC-510 is used, install the motor referring to the Instruction Manual for SC-510.
2. Installation of the synchronizer
Summary of Contents for MF-7800D Series
Page 64: ...60 5 Adjusting the upper knife stroke A B Standard Adjustment H21...
Page 66: ...62 MEMO...
Page 80: ...76 3 Adjusting the elastic band presser plate 0 5mm Standard Adjustment E10 A A Approx 7 5 mm...
Page 84: ...80 MEMO...
Page 94: ...90 3 Setting of SC 510 2 Change of the setting Type B Type A Standard Adjustment UT25...
Page 114: ...110 MEMO...
Page 118: ...114 2 Installing SC 510 1 Wiring SC 510 Standard Adjustment UT22...
Page 124: ...120 MEMO...
Page 134: ...130 MEMO...
Page 142: ...138 7 Feed timing of the roller A Standard Adjustment PL11 C D B...