
SECTION 3 - CHASSIS & TURNTABLE
3121234
3-113
Hub-Shaft Assembly
NOTE:
Refer to Figure 3-69., Hub-Shaft.
1.
Press Bearing Cup (1C) into Housing (1G) taking care to
ensure cup starts square with the bore of Hub (1G).
2.
Place Bearing Cone (1D) in Bearing Cup (1C) in Housing
(1G).
3.
Press or tap Seal (1B) Into the counterbore of Housing
(1G) to the point where it becomes flush with the Hous-
ing (1G) face. Care should be taken to insure Seal (1B) is
being correctly installed (smooth face up). Apply grease
to the rubber portion of the seal bore.
4.
Invert Hub (1G) and press Bearing Cup (1E) into counter-
bore of Housing (1G).
5.
Carefully lower Housing (1G) onto the Output Shaft (1A)
until Bearing Cone (1D) contacts the Output Shaft (1A).
6.
Press on the small end of the Bearing Cone (1D), being
careful not to contact the bearing cage, until the Bearing
Cone (1D) seats on the shoulder of the Output Shaft
(1A).
7.
Start the Bearing Cone (1F) onto the Output Shaft (1A).
8.
Press or tap the Bearing Cone (1F) onto the Output Shaft
(1A) until it is just seated in the Bearing Cup (1E). while
rotating the Housing (G).
9.
Install Bearing Spacer (1H) onto Output Shaft (1A) and
against Bearing Cone (1F).
10.
Install Retaining Ring (1I) into the groove in the Output
Shaft (1A). This Retaining Ring (1I) should never be
reused in a repair or rebuild.
EYE PROTECTION SHOULD BE WORN DURING THIS PROCEDURE.
11.
Tap the Retaining Ring (1I) with a soft metal punch to
ensure that the Retaining Ring (1I) is completely seated
in the groove of the Output Shaft (1A).
EYE PROTECTION SHOULD BE WORN DURING THIS PROCEDURE.
12.
Install O-ring Plug (1P) and torque to 23-24 ft. lbs.
(31-32 Nm).
Carrier Assembly
NOTE:
Refer to Figure 3-70. Carrier.
1.
Apply a liberal Coat of grease to the bore of Cluster Gear
(3F). This will enable the Needle Rollers (3C) to be held in
place during assembly.
2.
Install the first row of Needle Rollers (3C) into the bore of
Cluster Gear (3F).
3.
Insert Spacer (3D) into bore of Cluster Gear (3F) on top of
the Needle Rollers (3C).
4.
Place second row of Needle Rollers (3C) into bore of
Cluster Gear (3F) against Spacer (3D).
5.
Place Carrier (3A) so that one of the roll pin holes is
straight up.
6.
Start Planet Shaft (3E) through the hole in Carrier (3A).
Using ample grease to hold it in position, slide one
Thrust Washer (3B) over the Planet Shaft (3E) with the
tang resting in the cast slot of the Carrier (3A).
7.
With large end of Cluster Gear (3F) facing the roll pin
hole in the Carrier, place the Cluster Gear into position in
carrier (3A) and push Planet Shaft (3E) through the Clus-
ter Gear (3F) without going all the way through.
8.
Slide the second Thrust Washer (3B) between the Cluster
Gear (3F) and the Carrier (3A) with the tang of the
washer located in the cast slot of the Carrier (3A). Finish
sliding the Planet Shaft (3E) through the Thrust Washer
(3B) and into the Carrier (3A).
9.
Position the non-chamfered side on the Planet Shaft (3E)
roll pin hole so that it is in line with the hole in the Car-
rier (3A) using a 1/8” (3 mm) diameter punch.
10.
After using a 3/16 in. (5 mm) punch to align the two roll
pin holes. Drive the Roll Pin (3G) through Carrier (3A)
and into the Planet Shaft (3E) until the Roll Pin (3G) is
flush with the bottom of the cast slot in the Carrier (3A)
outside diameter at the thrust washer (3B) tang. Use a
1/4 in. (6 mm) pin punch to make sure the Roll Pin (3G) is
flush in the slot.
11.
Repeat Steps 1 through 10 for the remaining two Cluster
Gears (3F).
Summary of Contents for 680S
Page 2: ......
Page 52: ...SECTION 2 GENERAL 2 14 3121234 NOTES...
Page 55: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 3 This page left blank intentionally...
Page 89: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 37 Figure 3 28 Assembly Tools Seal Pressing...
Page 139: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 87 Figure 3 62 Swing Hub Prior to SN 0300134352...
Page 143: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 91 Figure 3 64 Swing Brake...
Page 205: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 153 This page left blank intentionally...
Page 208: ...SECTION 3 CHASSIS TURNTABLE 3 156 3121234 Figure 3 91 Generator Electrical Circuit Diagram...
Page 224: ...SECTION 3 CHASSIS TURNTABLE 3 172 3121234 Figure 3 103 EMR 2 Engine Side Equipment...
Page 225: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 173 Figure 3 104 Deutz EMR 2 Troubleshooting Flow Chart...
Page 229: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 177 Figure 3 108 EMR 2 Engine Plug Pin Identification...
Page 230: ...SECTION 3 CHASSIS TURNTABLE 3 178 3121234 Figure 3 109 EMR 2 Vehicle Plug Pin Identification...
Page 231: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 179 Figure 3 110 EMR2 Fault Codes Sheet 1 of 5...
Page 232: ...SECTION 3 CHASSIS TURNTABLE 3 180 3121234 Figure 3 111 EMR2 Fault Codes Sheet 2 of 5...
Page 233: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 181 Figure 3 112 EMR2 Fault Codes Sheet 3 of 5...
Page 234: ...SECTION 3 CHASSIS TURNTABLE 3 182 3121234 Figure 3 113 EMR2 Fault Codes Sheet 4 of 5...
Page 235: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 183 Figure 3 114 EMR2 Fault Codes Sheet 5 of 5...
Page 264: ...SECTION 3 CHASSIS TURNTABLE 3 212 3121234 NOTES...
Page 285: ...SECTION 4 BOOM PLATFORM 3121234 4 21 This page left blank intentionally...
Page 333: ...SECTION 4 BOOM PLATFORM 3121234 4 69 Figure 4 25 Load Sensing Device...
Page 336: ...SECTION 4 BOOM PLATFORM 4 72 3121234 NOTES...
Page 416: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 80 3121234 NOTES...
Page 423: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 7 Figure 6 2 ADE Block Diagram...
Page 480: ...SECTION 6 JLG CONTROL SYSTEM 6 64 3121234 NOTES...
Page 528: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 48 3121234 NOTES...
Page 529: ......