nano3G AP Installation Manual
nano3G AP Hardware Installation
N3G_INST_300 v14.0 for N3G_2.85 © ip.access Limited 2012
Page 53
Mount the nano3G S8 AP on a Stand
1)
Plug the Ethernet cable and the power cable into the AP or plug the cables from
the POE splitter into the AP.
2)
Slide the AP onto the stand.
3)
Place the AP on its stand on a stable flat surface.
Mount the nano3G S8 AP directly onto the wall
1)
Drill two holes 70mm (2.76in) apart vertically for the two screws.