INFICON
Installation | 6
074-594-P1H Micro GC Fusion Operating Manual
135 / 319
18 Tighten 1/2 turn past finger-tight using the 5/16 in. wrench.
19 The pressure reducer and gas-liquid separator installation is complete.
Reconnect the power cable, the Ethernet cable and the carrier gas lines.
20 Before connecting the pressurized sample to the device, close the metering
valve by turning the dial fully clockwise to ensure no sample flow through the
device when the pressurized sample is connected.