INFICON
Installation | 6
074-594-P1H Micro GC Fusion Operating Manual
127 / 319
15 Before connecting the pressurized sample to the device, close the metering
valve by turning the dial fully clockwise to ensure no sample flow through the
device when the pressurized sample is connected.
16 Install a user-provided 1/8 in. sample line with the female Swagelok fittings
preinstalled.
17 Connect a vent line to the vent fittings using 1/8 in. Swagelok fittings. Run the
exhaust to a fume hood or other designated area for hazardous waste disposal.
18 Slowly open the dial to allow the sample to flow through the device. Check the
flow indicated on the flow gauge and set the limit to less than 100 mL/min.