34
ifm
Programming Manual ecomatController/60-1 (CR711S) Operating System V2.5.0.n
2017-12-19
System description
Hardware description
>
Switch on/off via main switch
22917
To do so: VBB15 is connected with VBB30
Procedure when switching on the main switch
>
The system recognises the applied voltage (VBB15 > 5 V AND VBB30 > 8 V) and activates the
connection of the controller to the VBB30 potential via solid-state switch.
>
The controller boots and starts.
Procedure when switching off the main switch:
>
Running tasks will continue till the end.
IMPORTANT: The maximum length of tasks is 50 ms!
Tasks that run for longer will be aborted before the end of the task.
>
the system automatically stores the retain data
the input signals are no longer read
the outputs are switched off.
>
the system switches off completely
If this behaviour is not wanted, use the circuit via ignition lock: