Figures
1. Exploded view of the SAN Volume Controller
2145-CF8 node .
.
.
.
.
.
.
.
.
.
.
. 2
2. Exploded view of the SAN Volume Controller
2145-8A4 node .
.
.
.
.
.
.
.
.
.
.
. 6
3. Exploded view of the SAN Volume Controller
2145-8G4 node .
.
.
.
.
.
.
.
.
.
.
. 9
4. Exploded view of the SAN Volume Controller
2145-8F4 node.
.
.
.
.
.
.
.
.
.
.
. 12
5. Exploded view of the SAN Volume Controller
2145-8F2 node.
.
.
.
.
.
.
.
.
.
.
. 14
6. View of the redundant ac-power switch FRU
16
7. Exploded view of the 2145 UPS-1U hardware
17
8. SAN Volume Controller 2145-CF8
cable-management arm, support rails, and
associated parts .
.
.
.
.
.
.
.
.
.
. 21
9. SAN Volume Controller 2145-CF8 release
latches and mounting screws.
.
.
.
.
.
. 22
10. SAN Volume Controller 2145-CF8 cables in the
cable-management arm
.
.
.
.
.
.
.
. 22
11. SAN Volume Controller 2145-CF8
cable-management arm on the support arm .
. 23
12. Removing the SAN Volume Controller
2145-CF8 cable-management arm mounting
bracket .
.
.
.
.
.
.
.
.
.
.
.
.
. 24
13. Freeing the swing end of the SAN Volume
Controller 2145-CF8 support arm .
.
.
.
. 24
14. Removing the SAN Volume Controller
2145-CF8 cable-management stop bracket
.
. 25
15. Detaching the SAN Volume Controller
2145-CF8 cable-management support arm
.
. 25
16. Rack rear: Attaching the SAN Volume
Controller 2145-CF8 cable-management
support arm .
.
.
.
.
.
.
.
.
.
.
. 26
17. Rack rear: Installing the SAN Volume
Controller 2145-CF8 cable-management stop
bracket .
.
.
.
.
.
.
.
.
.
.
.
.
. 26
18. Attaching the free end of the SAN Volume
Controller 2145-CF8 support arm .
.
.
.
. 26
19. Rack rear: Installing the SAN Volume
Controller 2145-CF8 cable-management arm
mounting bracket
.
.
.
.
.
.
.
.
.
. 27
20. SAN Volume Controller 2145-CF8
cable-management arm on the support arm .
. 28
21. SAN Volume Controller 2145-CF8 cables in the
cable-management arm
.
.
.
.
.
.
.
. 29
22. SAN Volume Controller 2145-CF8
cable-retention brackets
.
.
.
.
.
.
.
. 30
23. SAN Volume Controller 2145-8A4 with the
cable-retention bracket installed .
.
.
.
.
. 31
24. SAN Volume Controller 2145-8G4 cable
retention bracket - type A .
.
.
.
.
.
.
. 32
25. SAN Volume Controller 2145-8G4 cable
retention bracket - type B .
.
.
.
.
.
.
. 32
26. The SAN Volume Controller 2145-8G4 with the
cable-retention bracket attached .
.
.
.
.
. 33
27. The SAN Volume Controller 2145-8G4 with
cable-retention bracket type B attached .
.
. 34
28. SAN Volume Controller 2145-CF8
cable-retention brackets
.
.
.
.
.
.
.
. 35
29. Raising the SAN Volume Controller 2145-CF8
locking levers of the slide rails of the rack .
. 36
30. Retaining screw on the SAN Volume
Controller 2145-8A4 node .
.
.
.
.
.
.
. 36
31. Installing the SAN Volume Controller
2145-8A4 cable retention bracket
.
.
.
.
. 37
32. SAN Volume Controller 2145-8G4 cable
retention bracket - type A .
.
.
.
.
.
.
. 38
33. SAN Volume Controller 2145-8G4 cable
retention bracket - type B .
.
.
.
.
.
.
. 38
34. The SAN Volume Controller 2145-8G4 before
you attach the cable-retention bracket .
.
.
. 39
35. The SAN Volume Controller 2145-8G4 with
cable-retention bracket type B attached .
.
. 40
36. Attaching the cable retention bracket to the
SAN Volume Controller 2145-8F4 power cable . 40
37. Removing the SAN Volume Controller
2145-CF8 from the rack
.
.
.
.
.
.
.
. 43
38. The captive thumbscrews that secure the node
and the shipping brackets .
.
.
.
.
.
.
. 45
39. Removing the SAN Volume Controller
2145-8G4 from the rack
.
.
.
.
.
.
.
. 47
40. Installing the SAN Volume Controller
2145-CF8 node in the slide rails of the rack .
. 51
41. Raising the SAN Volume Controller 2145-CF8
locking levers of the slide rails of the rack .
. 51
42. The captive thumbscrews that secure the node
and the shipping brackets .
.
.
.
.
.
.
. 52
43. The captive thumbscrews that secure the node
and the shipping brackets .
.
.
.
.
.
.
. 53
44. Aligning the SAN Volume Controller 2145-8G4
with the rack slides .
.
.
.
.
.
.
.
.
. 53
45. Sliding the SAN Volume Controller 2145-8F4
into the rack .
.
.
.
.
.
.
.
.
.
.
. 54
46. Disengaging the SAN Volume Controller
2145-CF8 slide rails from the rear of the rack . 55
47. Removing the SAN Volume Controller
2145-CF8 slide rails from the rack .
.
.
.
. 55
48. The rail-adjustment bracket and the release tab
on the rear rail-locking carrier .
.
.
.
.
. 56
49. Removing the latch strike from the front of the
slide rail
.
.
.
.
.
.
.
.
.
.
.
.
. 57
50. Removing the right slide rail from the front of
the rack .
.
.
.
.
.
.
.
.
.
.
.
.
. 57
51. The left support rail for the SAN Volume
Controller .
.
.
.
.
.
.
.
.
.
.
.
. 58
52. Installing the SAN Volume Controller
2145-CF8 slide rails on the rack .
.
.
.
.
. 59
53. Installing the rear of a SAN Volume Controller
2145-CF8 slide rail in the rear of the rack
.
. 59
© Copyright IBM Corp. 2003, 2010
v
Summary of Contents for SAN Volume Controller
Page 2: ......
Page 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 22: ...xx IBM SAN Volume Controller Hardware Maintenance Guide...
Page 26: ...xxiv IBM SAN Volume Controller Hardware Maintenance Guide...
Page 316: ...290 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 322: ...Taiwan Class A compliance statement 296 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 324: ...298 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 326: ...300 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 332: ...306 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 333: ......
Page 334: ...Part Number 31P1173 Printed in USA GC27 2226 03 1P P N 31P1173...