1
Operator-information panel connector
2
Operator-information panel cable
4.
Replace the top cover. See “Replacing the top cover” on page 72.
5.
If you removed the node from the rack, replace the node in the rack, as described in “Replacing the
SAN Volume Controller in a rack” on page 48.
6.
If you removed any fibre-channel or Ethernet cables, use the labels you placed on each cable to
replace all fibre-channel and Ethernet cables in the same ports from which they were removed.
7.
If you removed the power cords, replace the power cords and the cable-retention brackets, as
described in “Replacing the cable-retention bracket” on page 34.
8.
Lift the locking levers (
1
in Figure 218) on the slide rails and push the server
2
all the way into
the rack until it clicks into place.
1
2
Figure 217. Connecting the SAN Volume Controller 2145-CF8 operator-information panel cable
svc_bb1ka055
Figure 218. Raising the SAN Volume Controller 2145-CF8 locking levers of the slide rails of the rack
198
IBM SAN Volume Controller Hardware Maintenance Guide
Summary of Contents for SAN Volume Controller
Page 2: ......
Page 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 22: ...xx IBM SAN Volume Controller Hardware Maintenance Guide...
Page 26: ...xxiv IBM SAN Volume Controller Hardware Maintenance Guide...
Page 316: ...290 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 322: ...Taiwan Class A compliance statement 296 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 324: ...298 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 326: ...300 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 332: ...306 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 333: ......
Page 334: ...Part Number 31P1173 Printed in USA GC27 2226 03 1P P N 31P1173...