5.
Push the back rail bracket
1
(Figure 65) toward the front of the rail until it stops. The rail is now at
its shortest adjustment.
1
Latch-lever
2
Latch-lock
3
Back rail bracket
6.
Place the front end of the left rail in the rack cabinet. Align the top of the front bracket
1
(Figure 66) with the required EIA marking that is on the rack.
1
Front bracket
2
Rack-mounting flange
3
Locating pins
Figure 65. Opening the back latch-lock carrier assembly
1
2
3
Figure 66. Installing the front end of the rail
Chapter 2. Removing and replacing parts
67
Summary of Contents for SAN Volume Controller
Page 2: ......
Page 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 22: ...xx IBM SAN Volume Controller Hardware Maintenance Guide...
Page 26: ...xxiv IBM SAN Volume Controller Hardware Maintenance Guide...
Page 316: ...290 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 322: ...Taiwan Class A compliance statement 296 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 324: ...298 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 326: ...300 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 332: ...306 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 333: ......
Page 334: ...Part Number 31P1173 Printed in USA GC27 2226 03 1P P N 31P1173...