Table 18. C1001F00 to C1645300 checkpoints (continued)
v
If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v
See Chapter 3, “Parts listing, Type 8406,” on page 229 to determine which components are CRUs and which
components are FRUs.
Progress code
Description
Action
C1009x02
Hardware object manager: (HOM):
erase HOM IPL step in progress
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x04
Hardware object manager: (HOM):
build cards IPL step in progress
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x08
Hardware object manager: (HOM):
build processors IPL step in progress
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x0C
Hardware object manager: (HOM):
build chips IPL step in progress
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x10
Hardware object manager: (HOM):
initialize HOM
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x14
Hardware object manager: (HOM):
validate HOM
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x18
Hardware object manager: (HOM):
GARD in progress
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x1C
Hardware object manager: (HOM):
clock test in progress
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x20
Frequency control IPL step in progress
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
C1009x24
Asset protection IPL step in progress
1.
Go to “Checkout procedure” on page 184.
2.
Replace the system-board, as described in
“Replacing the FRU system-board and
chassis assembly” on page 260.
86
Power Systems: Problem Determination and Service Guide for the IBM Power PS700 (8406-70Y)