![Hyundai Yanmar 3TNV82A-B Manual Download Page 53](http://html1.mh-extra.com/html/hyundai/yanmar-3tnv82a-b/yanmar-3tnv82a-b_manual_2196324053.webp)
CONTROL SYSTEM
2-34
TNV Application Manual
Rack actuator output
The rack actuator output is a high-side output. See
The E-ECU adjust the magnitude of current flowing through the rack actuator solenoid by shortening or
lengthening the ON-duration of the output transistor. The rack position of the fuel injection pump varies
depending on the magnitude of current flowing through the rack actuator.
This technique where the ON duration of the transistor is changed to provide current control is called PWM
(Pulse Width Modulation). The PWM control period of the Eco-governor E-ECU is 0.4 ms.
Figure 2-21
Rack actuator output
EGR valve output
The EGR valve output is a high-side output. See
The EGR valve is driven by a stepping motor. This stepping motor adopts two-phase excitation and requires
holding current to keep the valve stopped. "Two-phase excitation" means that the solenoid is supplied with
two-phase current and "holding current" does that the solenoid is always energized. The motor of the EGR
valve is consequently approx. 24 watt heated even while the engine is at rest.
The E-ECU turns on or off the output transistors in the sequence shown in
, thereby driving the
solenoids for the stepping motor and opening/closing the EGR valve. The speed of the valve open/close
operation depends on the on/off speed of the transistors. The EGR valve opens at 125 pps (pulses per
second: the number of steps taken per second) and closes at 250 pps (20 pps for 10 steps before full close).
Figure 2-22
EGR valve driving mechanism
VB
R
a
ck
a
ct
ua
tor
ECU
PWM o
u
tp
u
t
0.4m
s
S
hort
Long
S
m
a
ll c
u
rrent
L
a
rge c
u
rrent
A
A
B
B
A
B
Open (co
u
nterclockwi
s
e)
A
B
A
B
Clo
s
e (clockwi
s
e)
A
B
Motorized v
a
lve oper
a
tion
ERG v
a
lve motor
(
S
tepping motor)
VB
ECU
VB
VB
VB
A
A
B
B
S
tep
S
tep
00_Electronic_Control_System.book 34 ページ 2006年5月29日 月曜日 午後2時12分
Summary of Contents for Yanmar 3TNV82A-B
Page 95: ...CONTROL SYSTEM 2 76 TNV Application Manual 00_Electronic_Control_System book 76...
Page 96: ...Appendix Standard harness 1 00_ _E fm 1...
Page 97: ...Appendix Standard harness 2 00_ _E fm 2...
Page 98: ...TNV Series service tool Operation Manual...
Page 132: ...32 7 Main Menu Figure 7 15 Data Logging Data Monitor Screen...
Page 145: ...7 Main Menu 45 Figure 7 27 System Installation Configuration Screen...