6-41
6-40-1
A
B
Ride control valve
Attention
Before carrying out any maintenance work the
accumulators must be unloaded (zero pressure).
Fo r t h i s, l o o s e n t h e nu t ( 4 ) a n d b o l t ( B )
counterclockwise with 10 mm spanner.
The accumulator will be unloaded (zero pressure)
in less than a minute.
The lifting system must firstly be secured against
lowering.
After carrying out maintenance work, screw the
bolt (B) and nut (A).
·
Tightening torque
A : 2.04 kgf
·
m (14.8 lbf
·
ft)
1)
2)
※
3)
4)
7609A6WE28
2) REMOVE FROM HYDRAULIC SYSTEM
Structure
(3)
1
Body
2
Hydraulic cap
3
Gas cap
4
Piston
5
V-O-ring
5A V-O-ring back-up washers
6
Piston ring (piston)
7
O-ring
7A O-ring back-up washer
8
Gas valve
8A Gas valve O-ring
9
Gas valve guard
9A Screw
1
2
4
3
9A
9
6
5
7
7A
5A
8A
8
WLACC03
Summary of Contents for HL955
Page 557: ...7 6 MEMORANDUM MEMORANDUM ...