UPS5000-S-600 kVA
User Manual (Three-phase, Three-wire)
3 Installation
Issue 05 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
57
Ensure that the installation ground is flat.
The marking-off template is delivered with the UPS.
Procedure
Step 1
Determine the cabinet installation positions on the ground based on holes in the marking-off
template for ground installation.
A: mounting holes on the channel steel
B: mounting holes on the floor
Figure 3-4
Mounting hole dimensions (unit: mm)
Step 2
Use a hammer drill to drill holes for installing expansion bolts, and install expansion sleeves
in the holes.