UPS5000-H-1200 kVA
User Manual (100 kVA Power Modules)
5 Operations
Issue 01 (2020-07-15)
Copyright © Huawei Technologies Co., Ltd.
147
5.6.2 Lithium Battery Test
5.6.2.1 Performing a Shallow Discharge Test
Before performing a shallow discharge test, ensure that:
The UPS is working in normal mode; float charging or hibernation has lasted for 2 hours
after the SOC reaches 100%; the load rate fluctuation is less than 10%.
The UPS generates no battery overtemperature, overvoltage, or overcurrent alarm. No
generator is connected to the UPS.
The mains, batteries, charger, and discharger are normal. No overload alarm is generated.
The SmartLi generates no alarms related to lithium batteries.
Automatic Shallow Discharge Test
1.
On the home screen of the LCD, choose
System Info
>
Settings
>
Battery Settings
and
set
Sched. shallow dis. test
to
Enable
.
2.
Set
Sched. shallow dis. test time
and
Sched. shallow dis. test interval
as required.
After setting is complete, the system will perform an automatic shallow discharge test
based on the settings.
Manual Shallow Discharge Test
1.
On the home screen of the LCD, choose
System Info
>
Maintenance
>
Battery Maint.
2.
Tap
Start
on the right of
Shallow Dis. Test
to start a shallow discharge test.
Figure 5-12
Starting a shallow discharge test
When the battery test is completed normally, the test data is used as common test data. Record the data
obtained from the latest five tests.
The shallow discharge test automatically stops in any of the following cases:
The battery discharge capacity reaches the specified value (10%–50%, 20% by default).
The discharge voltage reaches the warning threshold (calculated in real time).
The load rate fluctuation exceeds 10%.